The first thing Daryl and Chad (his employee) did was create holes in the basement floor. To be up to code, the braces must extend at least 3” below the surface of the floor. I marked the hole so you could see it.
Next, they put the i-beam in place, bolted it to the 2X10 rafters, cemented it in place, and carved the crack out before filling it with grout.
The final step was to block back the brace with 2X10 pieces (seen in the picture above sitting beside the braces) and voila – 17 braces in place, and a basement that will never move again! The next step will be to draw up a floor plan, frame the exterior walls, spray-foam the headers, insulate the rest of the walls with R-20 fiberglass, vapour barrier, and drywall. This will be enough to qualify me for the money from the Energuide Grant Program. All that will remain after that is to frame the interior walls, install a bathroom, drywall, install doors, paint the whole thing, install in fixtures, trim, and install a suspended ceiling. Maybe I should have said the “next steps”…